Scenario

Brainshelf’s Resurface team had a quick 30-minute decision meeting on 2026-04-15 to cut scope for the next sprint after a key engineer (elena-algo) flagged that a planned feature wouldn’t fit Q2 capacity. Three attendees: priya-pm, elena-algo, mia-design. Small team, casual notes only (no transcript). The PM runs the recap skill with only her bullet-point notes.

Source Notes:

  • Brainshelf is fictional
  • All metrics [fictional]

Prompt

/meeting-recap @priya-notes.md

Output

---
artifact_type: meeting-recap
version: 1.0
generated_at: 2026-04-15T21:45:00Z
generated_by_skill: foundation-meeting-recap
meeting_title: "Resurface Sprint Scope Cut"
meeting_date: 2026-04-15
meeting_start_time: "13:00 PT"
meeting_type: decision-making
project: resurface
topics:
- scope-cut-decision
- kept-scope-confirmation
attendees:
- name: priya-pm
role: decision-maker
- name: elena-algo
role: contributor
- name: mia-design
role: contributor
attendees_absent: []
related_agenda: null
related_brief: null
agenda_reconciliation:
topics_planned: []
topics_hit: [scope-cut-decision, kept-scope-confirmation]
topics_skipped: []
topics_emerged: []
meeting_quality:
outcomes_achieved: "no agenda outcomes to reconcile"
started_on_time: null
ended_on_time: null
key_attendees_present: true
meeting_type_source: inferred
unassigned_action_ratio: 0.0
input_quality: medium
confidence: medium
visibility: team
status: draft
---
# Meeting recap: Resurface Sprint Scope Cut
## Shareable summary
**Resurface Sprint Scope Cut** | 2026-04-15
Cut topic-clustered algorithm from this sprint (capacity); held recency-weighted (ships as planned).
Top actions: elena-algo: move topic-clustered to next-sprint backlog (Apr 16); mia-design: update design spec to recency-weighted only (Apr 17); priya-pm: note cut in sprint planning doc (Apr 16).
Full recap linked below.
---
## Full recap
### Meeting details
- **Date**: 2026-04-15
- **Actual duration**: [fictional] ~30 min (not timestamped)
- **Attendees present**: priya-pm, elena-algo, mia-design
- **Recording**: none (bullet notes only)
### Overall summary
Elena flagged earlier in the day that fitting both algorithm options into this sprint would overrun by 2 eng-days. Meeting decided to cut topic-clustered option to next sprint; ship recency-weighted this sprint. Short, focused decision meeting with no emergent topics.
### Agenda reconciliation
No prior agenda loaded (small-team ad-hoc meeting). Topic list derived from priya's notes.
### Topics
#### Scope-cut decision
*Type: Decision (inferred from discussion)*
**Discussion**
Elena walked through the capacity math: [fictional] ~3 eng-days for topic-clustered vs. 2 eng-days budget remaining in sprint. Mia confirmed design for recency-weighted is complete and ready; topic-clustered design would need one more pass. Priya weighed: shipping both this sprint risks quality; shipping only recency-weighted keeps the sprint on track.
**Decisions made**
- **Cut topic-clustered algorithm from this sprint; move to next sprint**. rationale: capacity math doesn't fit; design for topic-clustered needs one more pass anyway
- **Hold recency-weighted for this sprint; ship as planned**. rationale: design complete, capacity fits
**Actions**
- [ ] elena-algo: move topic-clustered to next sprint's backlog with full spec | Due: 2026-04-16 | Dependencies: none
- [ ] priya-pm: note the cut + reasoning in sprint planning doc | Due: 2026-04-16
**Open questions**
- None
---
#### Kept-scope confirmation
*Type: Information (inferred)*
**Discussion**
Quick confirmation that remaining scope (recency-weighted + related UI) is on track. Mia flagged a small UX refinement on the notification copy she wants to land before ship.
**Decisions made**
- None (confirmation of existing plan)
**Actions**
- [ ] mia-design: update design spec to reflect recency-weighted only + notification copy refinement | Due: 2026-04-17
**Open questions**
- None
---
### All actions (consolidated by owner)
#### elena-algo
- [ ] Move topic-clustered to next sprint's backlog with full spec | Due: 2026-04-16
#### mia-design
- [ ] Update design spec to reflect recency-weighted only + notification copy refinement | Due: 2026-04-17
#### priya-pm
- [ ] Note the cut + reasoning in sprint planning doc | Due: 2026-04-16
### Meeting quality signals
- **Outcomes achieved**: no agenda outcomes to reconcile (ad-hoc meeting)
- **Time management**: not timestamped; estimated ~30 min
- **Key attendee presence**: all three attendees present
### Next steps
- **When we reconvene**: no formal reconvene; next sprint planning on 2026-04-22
- **What needs to happen first**: elena completes backlog move; mia updates design spec
---
## Sources & References
### Primary inputs
- priya-notes.md (bullet-point notes, partial attribution)
### Referenced artifacts
- Agenda: none (ad-hoc meeting)
- Prior recaps: auto-discovery attempted; none matched
### External references
- None
### Generation context
- **Generated**: 2026-04-15T14:45:00Z
- **Skill version**: 1.0.0
- **Input quality**: medium. bullet notes only; no transcript; attribution required inference
- **Overall confidence**: medium. decisions clearly stated in notes; topic segmentation inferred from discussion order
- **Known gaps**: exact meeting duration not recorded; start/end-on-time signals not available
- **Inferences applied**: meeting type inferred as decision-making [confidence: medium, scope-cut framing cue]; topic structure inferred from notes order
- **Fabrication check**: all action owners (elena-algo, mia-design, priya-pm) in attendees list; 0 unassigned actions