Requirements Traceability Matrix

beta  ·  Family governance-docs  ·  Phase undefined  ·  Sizes lean, full  ·  ~5,200 tokens

The standing table that links each requirement to the work that verifies it, read in both directions, so that a requirement with no verification can be seen. A linked test is not a verified requirement, so the matrix defines what its status words mean before it fills a row. Distinct from the traceability field on a single test case and from the dated result of one test cycle. A contested type: keep one only where the team has decided it owes a whole-set answer to which requirement has no verification.

Fast reference for using the requirements-traceability-matrix bundle. For the full reasoning, the disagreements between sources, and the citations, read requirements-traceability-matrix_companion.md.

Decide whether to keep a matrix before you fill one in. This type is contested. Named practitioners say it rarely repays its upkeep, this library’s research found no named software team outside regulated or safety-critical work that describes keeping one (high confidence that the search found none, medium that none exists), and no source read shows that keeping one improves outcomes. The case this bundle can make is narrow: where a team has decided it owes a whole-set answer to the question “which requirement has no verification”, a table is one way to give it. Read When NOT to use first. That recommendation is this library’s position, not a measured finding.

  • The team has decided that someone, such as a release reviewer, an auditor or the team itself, is owed a single answer to “which requirement has no verification”, and a requirement with no test must be visible in that answer. A table with one row per requirement shows it, and a test case’s own traceability field cannot, because a requirement with no test has no test to hold the field. That reasoning is this library’s inference, and no source states it.
  • The requirement set is bounded: one feature, one release, or one product area. A bounded matrix is this library’s way of applying NASA’s value-based tracing.
  • The work is regulated or safety-critical. The sources that say traceability is owed, or that publish a matrix, are regulated practices. Whether any standard requires a matrix was not read.
  • No tracker already holds the requirement-to-test links, or you can state in one sentence what this file adds that the tracker does not.
  • The team is unregulated and cannot name a reason. If the Purpose and Boundary section cannot say what you chose to trace, what you chose not to, and when you will stop, do not start. Companion section 6 gives the conditions Ambler names.
  • A tracker already holds the links. Name the tracker as the record, and do not keep a copy. A table that restates links held elsewhere creates a second record that can disagree with the first. That reasoning is this library’s own.
  • The situation is simple. Ambler says that where people know the system, it is “much easier and cheaper to simply ask them to estimate the change”. In this library’s view, a solo or very small team should treat the lean size as the largest to consider, and no matrix may be the right answer.
  • You want NASA’s requirements verification matrix. It is scoped to “shall” statements and records how each is verified. It is a related artifact, and this bundle’s template is not a copy of it.
  • You want proof that the matrix improves outcomes. Nothing read supplies it. See companion section 6.

Several things a reader might expect in a traceability document already have a home elsewhere. The matrix owns the current links, and it owns nothing else. Each line below is this library’s position unless noted.

You want to record It belongs in
The current link from each requirement to what verifies it, across the whole set This matrix
The link from one test to what it verifies The test-case bundle’s own traceability field. The matrix reads it as input
The dated result of one test cycle The test-summary-report bundle. A report is a dated result of one cycle, and a matrix row stays open. No source states this boundary directly
The decision to change a requirement, and who agreed The change-log bundle. The change log records the decision, and the matrix records the current links
A risk’s likelihood, impact and owner The risk-register bundle. The full variant’s Risk Control Trace links to it by identifier and copies no score
The requirement’s own text The source document, such as the prd, user-stories or acceptance-criteria bundle. NASA’s handbook says “do not duplicate requirements in the traceability matrix”

A matrix that starts carrying risk scores, issue status or metric definitions has begun to collapse into a neighbouring governance-docs member, which the family contract warns against.

  • Lean (default): Purpose and Boundary, Trace Conventions, The Matrix, Coverage Gaps, and Upkeep and Review Trigger. A requirement-to-test table read in both directions, the narrowest definition in the sources, with the rules that give its status words a meaning and the owner who keeps it current. Start here unless you owe an answer the lean table cannot give.
  • Full: adds Implementation Trace (each requirement to its design reference and its code or task reference), Risk Control Trace (each risk to the requirement that controls it and the test that verifies the control) and Baselines (dated snapshots of what a release or an audit saw). Move to full when the team owes one of three answers: which design element implements this requirement, which control covers this risk, or what an auditor saw at a given release. Without such a question, lean is enough.

Grow lean into full by inserting the three sections after Coverage Gaps and before Upkeep and Review Trigger; the five lean sections keep their name and order. Confidence that this split is right is medium-low: no source read shows a template that carries every link type, so the split is this library’s hypothesis and not a sizing rule any source states.

Three cautions on the full sections:

  • Drop Implementation Trace when a tracker already holds the links. Write “N/A” and one line saying which tracker is the record.
  • Risk Control Trace has the thinnest support of any section. The only sources are one medical-device vendor and the FDA’s reference to a trace to “risk analysis results”. No general software source read asks for it. Use it only when a risk register already exists, and write “N/A, no risk register exists for this product” otherwise.
  • Baselines suits a team with audits or formal releases. A snapshot of an out-of-date table keeps the out-of-date table, so reconcile the table before you snapshot it.

Score each row 0, 1, or 2. Below 17 out of 24, a reader who opens the matrix to learn which requirement has no verification cannot trust the answer: a requirement may have no row, a status word may mean only that a test exists, or the table may have drifted from its sources with nothing in the file to show it. A lean matrix carries no Implementation Trace, Risk Control Trace or Baselines section to grade, so it is scored, and cleared, against a smaller table; see the scope table below.

# Criterion 0 1 2
1 Reason to keep it Purpose and Boundary says what the matrix covers but gives no reason the team keeps one A reason is given, but nothing says what was left untraced, or what ends the matrix You can point at the sentence giving this team’s reason, the sentence naming what was left untraced, and the stated event that ends it, so a reader could tell from the file alone when to delete it
2 One named record Nothing says whether this file or a tracker holds the links A record is named, but the file does not say what it adds beyond the tracker, or what the tracker holds instead You can point at the sentence naming where the links are authoritative and, where a tracker holds any of them, the sentence saying what this file adds that the tracker does not
3 Verified is defined No definition of verified or covered appears, or the status words are used undefined A definition exists, but a row could meet it on a linked test alone, with no statement of what the test had to do or what evidence is kept You can point at the sentence, and say what evidence a verified row rests on beyond a linked test, so two people reading the same row would mark it the same way
4 Other means marked A requirement checked by inspection, analysis or demonstration is shown as a gap, or is marked verified with no record of the check A status for other means exists, but names no record of the check You can point at a requirement checked by other means, see its status and the record named, or point at the sentence saying no requirement here is checked that way
5 Every requirement has a row A requirement you pick from the source document that has no test cannot be found in the table Rows exist for the requirements you check, but no rule says which statements of the source count as requirements, so you cannot tell whether others are missing A requirement you pick from the source document that has no test has its own row with an empty Verified by cell, and the scope rule tells you which statements were counted
6 Links, not copies Rows copy the requirement’s full text, or the Source cell is blank Labels are short, but some Source cells point nowhere a reader can open For any row you can open the Source cell’s target and find the requirement’s full text there, and the row carries only the source’s own identifier and a short label
7 Status follows definition A row marked verified has an empty Verified by cell, or names a test that has not run Verified rows name a test, but the evidence the definition asks for cannot be found from the row Pick any verified row: you can follow its Verified by cell to a test result or an other-means record, and confirm the condition in Trace Conventions is met, without asking the keeper
8 Gaps have decisions Coverage Gaps is blank, or lists gaps with no owner and no decision Requirements with no verification have owners and decisions, but nobody checked the tests against the requirements You can point at the line showing the tests were checked against the requirements, naming each test with no requirement or stating none was found and when; every gap has a named owner and a recorded decision
9 Current against changes No owner, no update events or no reconciliation date appears, or the section says only “updated as needed” An owner, events and a date are given, but the date is older than the latest change to the requirements or tests, or the only trigger is a calendar interval You can point at a named owner, the events that force an update and a date last reconciled, and comparing that date with the newest change in the source documents or test records shows the table was reconciled after it
10 Implementation references open (full) Cells say “done” or “in code”, or copy design text or ticket titles References are present, but some point nowhere a reader can open, or a requirement with no reference is left unmarked For any row you can open the design reference and the work reference; a requirement with neither is marked as a finding; or the section says N/A and names the tracker that is the record
11 Risk links by ID (full) Risk likelihood or impact is copied into the table, or a risk has no register identifier Register identifiers are used, but a risk with no controlling requirement, or a control with no verifying test, is left unmarked Every risk row carries the register’s own identifier, the controlling requirement and the verifying test, a missing link is listed as a finding, and no score appears; or the section says N/A because no risk register exists
12 Dated baselines (full) A baseline is mentioned with no date and no location A date and an event are given, but the location or the reviewer is missing, or the copy’s own last-reconciled date is later than its snapshot date or is absent For each snapshot you can open the copy at the stated location and see its date, the release or review, and who reviewed and approved it, and the copy’s own last-reconciled date is on or before the snapshot date
Variant Rows scored Maximum Threshold
lean 1-9 18 13
full 1-12 24 17

Lean ships no Implementation Trace, Risk Control Trace or Baselines section, so rows 10 through 12 grade content it does not carry; score a lean matrix against rows 1 through 9 only. A lean matrix at 13 out of 18 clears a comparable bar to a full matrix at 17 out of 24.

Each of these is a failure mode a source describes or this library infers. None is measured for how common it is.

  1. Copying requirement text into the matrix. NASA’s handbook says “do not duplicate requirements in the traceability matrix”. In this library’s reasoning, a copy that drifts from the source document turns one requirement into two. Fix: a short label and a link to the source, which owns the text.
  2. Treating a linked test as a verified requirement. A test case identifier in the Verified by cell shows that a test exists. NASA ties the completion of verification to “documented objective evidence of compliance with requirements or waiver” and to closure of nonconformance reports. A table full of green rows can hide requirements nobody verified. Fix: define verified in Trace Conventions in terms of evidence, and mark a row only when its cell meets that definition.
  3. Filling rows only for requirements that already have a test. The table then shows the team’s tests and not its requirements, and the requirement nobody verified is the one missing from it. Fix: build the rows from the source document’s requirements, and leave Verified by empty where nothing verifies the requirement.
  4. A forward-only matrix. Orcanos, a vendor selling a medical-device platform, says “An RTM that only maps forward is incomplete.” That is one vendor’s claim, in an audit frame, and no source read measures how common it is. A row-per-requirement table cannot show a test with no requirement, because that test has no row. Fix: check the tests against the requirements and record each orphan test in Coverage Gaps.
  5. Flagging a gap and leaving it. NASA’s guidance is that orphans are discussed by the project team and assurance personnel, and that a missing requirement found to be necessary is added. A gap with no owner and no decision is a list of worries. Fix: an owner and one decision per gap, and a one-line statement with a date when the list is empty. An empty list is only as good as the rows and the definition of verified behind it.
  6. Letting the table go stale. NASA warns that manual methods “do not include automatic updates”, so the project has to be diligent about keeping traces current. No source gives a calendar interval, and none says how fast a hand-kept table goes stale. Fix: a named owner, a list of events that force an update, and a date last reconciled, compared against the last change to the requirements or tests.
  7. A matrix kept for its own sake. A team that cannot say what it chose to trace, what it chose not to trace and when it will stop is keeping the table because tables are kept, and the file drifts into a second copy of whatever the tracker already says. Fix: write the three sentences in Purpose and Boundary, and if they cannot be written, drop the matrix.
  8. A requirement without an identifier. A statement with no ID has no row, so nothing can trace to it. That the loss goes unseen is this library’s inference. Fix: assign an identifier before the statement is traced, and record the decision in the table.
  9. Copying risk scores into Risk Control Trace (full). The score then lives in two places, and the copy goes stale the first time the risk register changes. Fix: reference the risk by its register identifier and leave likelihood, impact and owner in the register.
  10. Baselining a table that has not been reconciled (full). The snapshot preserves the stale table and gives it the weight of a reviewed record. Fix: reconcile first, record the reconciliation date, and then take the snapshot.

Whether a matrix pays for itself outside regulated work, who may mark a row verified, what review interval to use, and what any standard requires are all unsettled by what was read. Companion sections 2, 3 and 6 state them.

This bundle’s family contract states plainly that no governance skill exists in pm-skills today for any of its members, so every member adopts pairs_with: [] until one does. Until a governance-side skill exists, this template is filled by hand.

requirements-traceability-matrix_template-lean.md · ~5,200 tokens

---
title: "{{product_name}} Requirements Traceability Matrix"
product: "{{product_name}}"
owner: "{{owner}}"
last_reconciled: "{{last_reconciled}}"
status: "{{status}}"
doc_type: requirements-traceability-matrix
size: lean
source_template: requirements-traceability-matrix
source_template_version: 0.1.0
---
<!--
LEAN REQUIREMENTS TRACEABILITY MATRIX. The smallest matrix that is still a real one: what it covers
and which place is the record, the rules that say what a link and a status mean, the table of
requirements with what verifies each, the gaps in both directions, and the owner with a stated trigger
for updating it. This is what TestDevLab describes, requirement to test, read in both directions. Use it
by default. To grow it into the full form (see requirements-traceability-matrix_template-full.md), ADD
sections: Implementation Trace, Risk Control Trace and Baselines, after Coverage Gaps and before Upkeep
and Review Trigger. Never rename or reorder the sections below, because the full variant is a strict
superset of this one. The signal to scale up is a question the team owes an answer to that this table
cannot give: which design element implements a requirement, which control covers a risk, or what an
auditor saw at a given release. That signal is this library's POSITION, and confidence in the lean and
full split is medium-low.
WHAT A REQUIREMENTS TRACEABILITY MATRIX IS. TestDevLab, a vendor, gives the narrowest definition: "A
Traceability Matrix is a document that links and maps project requirements to their corresponding test
cases." In this library's reading, it is a standing register, edited as requirements and tests change, not a record filed once.
Traceability is a property, and the matrix is one way to hold it: InfoQ reports Brad Appleton writing
"Traceability matrix on the other hand is one of the possible implementations of traceability." The
first use of the phrase is not established by anything read, and this template offers no origin story.
A LINKED TEST IS NOT A VERIFIED REQUIREMENT. NASA ties completion of verification to "documented
objective evidence of compliance with requirements or waiver" and to "closure of all discrepancy and
nonconformance reports". A test case ID in a Verified by cell shows that a test exists, not that the
requirement was verified. Trace Conventions is where the matrix says which of the two its status words
mean.
THIS TYPE IS CONTESTED, AND NOTHING READ SHOWS THAT KEEPING ONE IMPROVES OUTCOMES. InfoQ's 2008 roundup
reports Alistair Cockburn writing "I have, in 30 years in the business, in industry, research and a
little bit in government, NEVER seen a traceability matrix pay off." That is a second-hand report of a
mailing-list post. This research found no named software team outside regulated or safety-critical work
that describes keeping one (high confidence that the search found none, medium that none exists). A
mapping study of 63 papers says "strong empirical evidence from industry is needed to validate the
impact of traceability on maintenance and evolution". Keep a matrix only where the team has decided it
owes a whole-set answer to the question of which requirement has no verification, and say so in Purpose
and Boundary. Where a tracker already holds the links, that tracker is the record and this file should
say so. That recommendation is this library's POSITION. This matrix is also not NASA's requirements
verification matrix, which is a related artifact. No standard was read for this bundle, so nothing here
says what IEEE 829, IEEE 830, ISO/IEC/IEEE 29148, 21 CFR 820 or DO-178C requires.
HOW TO FILL THIS IN
1. Read the comment under each heading: WHAT, WHY (with a companion pointer), ASK, GOOD, WEAK, TRAP;
the three table sections also carry PRIORITY and ROW HINT.
2. Replace each {{placeholder}}. Write the Purpose and Boundary and Trace Conventions sections before
you fill a single row, because the rows mean nothing until the status words are defined. Give each
requirement a short label and a link to its source document; never copy the requirement's text
into the matrix.
3. If a section does not apply, write "N/A" and one line of why, rather than deleting it. A reader
cannot tell a deleted section from one nobody considered.
4. A matrix is never finished, but before you share it: self-grade against
requirements-traceability-matrix_guide.md, then DELETE every HTML comment. They are guidance, not
content.
-->
# {{product_name}} Requirements Traceability Matrix
## Purpose and Boundary
<!-- WHAT A short statement of the product and requirement set this matrix covers, what the team
chose not to trace, who keeps it, and whether this file or a named tool is the record.
WHY The sources disagree on what the matrix is: a table of requirements and test cases for
TestDevLab, a wider chain for Visure, and for Jama, a vendor that sells the live
replacement, the wrong form altogether. A reader needs to know which of these the file
claims to be, so the section names the one place that is the record. NASA says a matrix
"can be manually created and maintained, or may be a by-product of a requirements
management tool". This is also where an unregulated team justifies the matrix to itself:
what it chose to trace, what it chose not to, and when it will stop. The boundary
statement is this library's POSITION, and no source read asks for one. Deep dive:
requirements-traceability-matrix_companion.md section 3 (Purpose and Boundary) and
section 6.
ASK Which product, and which set of requirements, does this matrix cover, and what did the
team choose not to trace? Who keeps it? Is this file the record, or does a tracker hold
the links, and if so what does this file add? Why is the team keeping a matrix at all,
and what will make it stop?
GOOD "This matrix covers the offline-sync requirements of Harbor Notes, REQ-20 to REQ-27, and
nothing else in the product. It is kept by the sync team's QA lead. This file is the
record: the team's tracker holds tickets but no requirement-to-test links. Not traced:
attachment sync, which is out of scope this quarter. The team keeps a matrix because a
sync defect can lose a user's notes, and will stop when the sync rewrite ships and the
tracker holds the links."
WEAK "Requirements traceability matrix for the product." (names no requirement set, no record,
no reason to keep one and no stop condition, so a reader cannot tell what the table
claims to cover or whether it is still wanted)
TRAP Keeping the table because tables are kept. A team that cannot say what it chose to trace,
what it chose not to trace and when it will stop has no reason to keep a matrix, and the
file will drift into a second copy of whatever the tracker already says. -->
**Product and requirement set covered:** {{covered_set}}
**Not traced:** {{not_traced}}
**Kept by:** {{owner}}
**The record:** {{record_of_truth}}
**Why this team keeps a matrix:** {{reason_for_matrix}}
**When it will stop:** {{stop_condition}}
## Trace Conventions
<!-- WHAT The identifier schemes for requirements and tests, the rule for what counts as a
requirement, a statement of what counts as verified, how other means of verification are
marked, how links that are not one-to-one are written, and the status vocabulary.
WHY A table of links is only as meaningful as the rules that decide what a link means. No
source read gives a template for this section, so its form is this library's POSITION,
and the companion lists the supports. NASA's verification guidance ties completion to
"documented objective evidence of compliance with requirements or waiver", together with
"closure of all discrepancy and nonconformance reports". In this library's reading, a
linked test case is therefore a claim that a test exists, and not a claim that the
requirement was verified. The jamb documentation, a practitioner's tool guide, flags
requirements "indicating they are verified by other means (inspection, analysis,
demonstration)". Without such a status, in this library's reading, a requirement
verified by inspection reads as a gap. NASA also says "the relationships identified in
the matrix are not required to be one-to-one". Who may mark a row verified is not
established by any source read, so a team that wants a rule states it as its own. Deep
dive: requirements-traceability-matrix_companion.md section 3 (Trace Conventions).
ASK How are requirements and tests numbered, and which statements count as requirements? In
one sentence, what must be true before a row is marked verified: a test exists, a test
passed, or evidence is attached and no defect against the requirement is open? How does
the matrix mark a requirement checked by inspection, analysis or demonstration, and how
are many-to-many links written? What does each status word mean, in one sentence each?
PRIORITY The definition of verified is written before any status word is used, and it says
what evidence a verified row rests on, not only that a test is linked. If the team says covered, define that word here: it can mean a linked test or a verified requirement.
ROW HINT A good status row names the status and the condition that earns it, so two people
reading the same row would mark it the same way. A weak row names a status with no
condition, or defines it as the existence of a test.
GOOD Requirement IDs: "REQ-n, assigned in the sync spec and not reused." Test IDs: "T-n, from
the test management tool." Scope: "Every numbered sentence in sections 4 and 5 of the sync
spec; the introduction and the glossary are not requirements." Verified: "A named test
passed on a named build, the evidence is attached to the test record and no defect against
the requirement is open." Other means: "A requirement checked by inspection carries the
status Other means and names the review record." Links: "One requirement may list several
tests and one test may list several requirements; both directions are written out."
Status table rows:
| No verification | Nothing is linked: no test and no other-means record |
| Test linked | A test exists but has not yet run or has not passed |
| Verified | The verified condition above is met |
| Other means | Checked by inspection, analysis or demonstration, with the record named |
WEAK Status table row: | Covered | Done | (does not say what evidence earns it, so a linked test
and a verified requirement read the same)
TRAP Letting covered mean that a test case ID sits in the Verified by cell. A table full of
green rows can then hide requirements that were never verified, and nothing in the file
shows it. -->
**Requirement identifiers:** {{requirement_id_scheme}}
**Test identifiers:** {{test_id_scheme}}
**What counts as a requirement:** {{scope_rule}}
**What counts as verified:** {{verified_definition}}
**Verified by other means:** {{other_means_rule}}
**Links that are not one-to-one:** {{cardinality_rule}}
| Status | What it means in this matrix |
|---|---|
| {{status_name}} | {{status_meaning}} |
## The Matrix
<!-- WHAT One row per requirement, with its identifier, a short label, its source, what verifies it,
its status and any notes.
WHY This table is the artifact. The other sections explain it, bound it or extend it. The
columns draw on Visure's component list, "Requirements ID and Description", "Source of
Requirements" and "Associated Test Cases", and on TestDevLab's requirement-to-test pair.
Neither the Visure page nor the TestDevLab page shows a full table, so the column set is this library's assembly from
partial lists and not any one source's shipped layout. The row holds a short label and not
the requirement's full text, because NASA's handbook says "do not duplicate requirements
in the traceability matrix". In this library's reasoning, a copy of the text drifts from the original. The source
document owns the text, and the matrix owns the links. One matrix or several is a stated
choice: NASA says "Traceability matrices can be included in the documents to which they
apply", or "they can be combined into a single matrix covering higher level requirements,
software requirements, design, code, and verification", and its systems handbook adds
"This matrix could be divided into multiple matrices (e.g., one for each requirements
document)". This template ships one table for the covered set. The table is read in both
directions and is not kept as two: TestDevLab describes both checks on the same table,
that "every requirement is covered by at least one test case, and conversely, that every
test case is linked to a valid requirement". A table with one row per requirement cannot
show a test that has no requirement, because that test has no row, so Coverage Gaps is
where that half of the check lives; that reading is this library's inference. Deep
dive: requirements-traceability-matrix_companion.md section 3 (The Matrix).
ASK Which requirements are in scope, and does every one of them have a row, including those
with nothing yet in the Verified by cell? Where does each requirement's source document
say it, and does the row link there rather than copy it? Is this one table, or does the
team split it by requirements document, and where are the other tables?
PRIORITY Every requirement in scope has a row, including the ones with no verification. An
empty Verified by cell is the reason the table exists, and a row for a requirement with no
verification is a finding and not an error.
ROW HINT A good row has a stable identifier, a label short enough to scan, a source a reader can
open, every test or other means that verifies it, and a status that follows the
definitions in Trace Conventions. A weak row copies the requirement's full text, leaves the
source blank, or marks a status the Verified by cell does not support.
GOOD | REQ-22 | Edits made offline are synced on reconnect | Sync spec 4.2 | T-31, T-32 |
Verified | T-32 passed on build 118 with the log attached; no defect open |
WEAK | 22 | sync | | T-31 | Covered | |
TRAP Filling in rows only for the requirements that already have a test. The table then shows
the team's tests, not its requirements, and the requirement nobody verified is the one that
is missing from it. -->
| Requirement ID | Requirement (short label) | Source | Verified by | Status | Notes |
|---|---|---|---|---|---|
| {{requirement_id}} | {{requirement_label}} | {{requirement_source}} | {{verified_by}} | {{requirement_status}} | {{requirement_notes}} |
## Coverage Gaps
<!-- WHAT The requirements with no verification, the tests with no requirement, and what each gap's
owner decided.
WHY Both vendor sources name finding gaps as a purpose. TestDevLab lists "Identify Gaps:
Highlight any requirements that do not have a corresponding test case." Visure's product
description includes the ability to "detect missing links". The backward half matters too:
Orcanos, a vendor selling a medical-device quality platform, says "An RTM that only maps
forward is incomplete." Its frame is an audit of a medical device, and the claim is one
vendor's. A gap that is only flagged has not been dealt with. NASA says orphans "need to
be discussed by the project team and assurance personnel", and that "If they are
determined to be necessary, any missing source requirements are added to the project." So
the section asks what each gap's owner decided: add a test, add a requirement, mark the
requirement as verified by other means, or remove the orphan. How a gap is displayed is
not shown by any source read, so this section's layout is this library's POSITION. Do not
read an empty list as a clean bill of health: it is only as good as the rows and the
definition of verified behind it. That caution is this library's inference. Deep dive:
requirements-traceability-matrix_companion.md section 3 (Coverage Gaps).
ASK Which requirements have no test or other means of verification? Which tests point to no
requirement? Who owns each gap, and what did they decide to do about it?
PRIORITY Every gap has an owner and a decision. A gap with no owner and no decision is a list of
worries. If the list is empty, say so in one line and say when the rows were last checked.
ROW HINT A good row names the kind of gap, the identifier, an owner, and a decision that is one
of the four above or a reasoned alternative. A weak row says that something is missing
and names neither the identifier nor the owner.
GOOD | Requirement with no verification | REQ-25 | Sync lead | Add a test: T-40 to be written
before the beta | Beta is the next review point |
WEAK | gap | sync stuff | team | look into it | |
TRAP Flagging a gap and leaving it. A gap list that grows without decisions teaches readers to
ignore it, and it makes the matrix look more complete than the verification behind it. -->
| Gap | ID | Owner | Decision | Notes |
|---|---|---|---|---|
| {{gap_kind}} | {{gap_id}} | {{gap_owner}} | {{gap_decision}} | {{gap_notes}} |
## Upkeep and Review Trigger
<!-- WHAT The events that require an update, the owner who makes it, the points at which the matrix
is reviewed, and the date it was last reconciled.
WHY A matrix that nobody maintains turns from a record into false assurance. NASA's guidance
is "Assign responsibility for creating and maintaining the matrix to a project team
member" and "Ensure a review of the matrix at major phases/key reviews of the project.",
and it warns that manual methods "do not include automatic updates". The update rule
comes from Jama, a vendor: a matrix "should be updated whenever requirements, test
cases, or linked lifecycle artifacts change, not just on a calendar schedule." No source
read gives a calendar interval, and this template does not invent one. Tools handle
staleness with a mechanism, such as the content hash the jamb documentation describes. A
hand-kept table has none, so this template's stand-in is an owner, a list of trigger
events and a date last reconciled. No source read puts a last-confirmed field on a
hand-kept row, so that form is this library's POSITION. Deep dive:
requirements-traceability-matrix_companion.md section 3 (Upkeep and Review Trigger).
ASK Who owns the upkeep? Which events force an update: a changed requirement, a
new or retired test, a change to a linked ticket? At which reviews or releases is the
whole table checked? When was it last checked against its sources?
GOOD "Owner: the sync team's QA lead. Triggers: a requirement is added, changed or deferred; a
test is added, retired or fails after passing; a change request touching sync is approved.
Review points: before each beta and release review. Last reconciled: 2026-09-10, against
sync spec v6 and the test management tool."
WEAK "Updated as needed." (no owner, no trigger and no date, so a reader cannot tell whether the
table is current or was current once)
TRAP Setting a calendar interval and calling it a rule. Jama ties updates to change and NASA ties
reviews to major phases and key reviews, and no source read gives an interval. A date older
than the last trigger event is a warning that the table may be stale, however recently the
calendar says it was reviewed. -->
**Owner:** {{owner}}
**Events that require an update:** {{update_triggers}}
**Review points:** {{review_points}}
**Date last reconciled:** {{last_reconciled}}

The reasoning, the history and every source, in the repository:

  • Companion - the long-form argument: why these sections, where the sources disagree, and what the bundle refuses to claim
  • History - what changed in this bundle, and when
  • Research log - every source consulted, with what each one actually supports
  • Catalog metadata - the machine-readable record this page is generated from

Catalog record: 8 sections across 1 format(s), methodology generic, typically owned by BA / QA.